200475 Replace Security Fencing And Access Control (North And West Quadrants) #16770
Status
Bidding Closed
Prebid Date | 10/3/24 10:00am |
Bid Date | 10/10/24 1:00pm |
The Northwest Alabama Regional Airport Authority will receive bids for the project entitled “Replace Security Fencing and Access Control (North and West Quadrants)”, FAA AIG BIL No. 3-01-0054-049-2025, at the Northwest Alabama Regional Airport; 1729 T. Ed Campbell Drive, Suite A, Muscle Shoals, AL 35661 in the Airport Conference Room, on October 10, 2024, until 1:00 P.M. local time at which time and place all proposals will be publicly opened and read aloud. Proposals received after the stated time will not be accepted.
The work is generally described as follows:
This project consists of the removal and replacement of the existing security fence, airport gates, and access control along the northern and western perimeter of the Airport. Base Bid work includes the removal and replacement of the existing security fence, airport gates, and access control from the East General Aviation Apron to East Washington Drive. Additive Alternate 1 work includes the removal and replacement of the existing security fence, airport gates, and access control from East Washington Drive to Bob Riley Drive. Additive Alternate 2 work includes drainage repairs along the northern and western perimeter of the Airport.
An Informational Pre-bid Meeting will be held on October 3, 2024, at 10:00 A.M. local time at the Northwest Alabama Regional Airport, Airport Conference Room. Contractors may also join remotely via a WebEx Meeting. Contact the office of the Engineer for access information required to join the meeting.
Bid security is required in the form of a bid bond equal to 5% of the total bid with a maximum amount of ten thousand dollars ($10,000). Contract security in the form of 100% Performance and Payment Bonds will be required.
No bid may be withdrawn after closing time for the receipt of bids for a period of one-hundred twenty (120) days.
Bidding Documents may be examined at the following locations:
Office of the Engineer:
Michael Baker International, Inc.
11 N. Water Street, Suite 14290
Mobile, Alabama 36602
(251) 380-0898
Airport Authority Office:
Northwest Alabama Regional Airport Authority
1729 T. Ed Campbell Drive, Suite A Muscle Shoals, AL 35661
(256) 383-2270
Bid documents are being made available via paper or digital copy. Plan holders are required to log-on or register for an account at www.mbakerplanroom.com to view and order Bid Documents. All plan holders are required to have a valid email address for registration. Bid documents are non- refundable and must be purchased through the website. For anyone interested in submitting bids electronically in place of a sealed bid, they may do so only through www.mbakerplanroom.com. Questions regarding website registration, online orders or electronic bidding, please contact Plan House Printing at (228) 248-0181.
Each paper bid must be submitted in a SEALED ENVELOPE, addressed to the OWNER. If the BID is sent through the mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope with the notation "BID ENCLOSED for Replace Security Fencing and Access Control (North and West Quadrant)” on the face thereof.
Each electronically submitted bid must be submitted in “pdf” format and shall contain the same information and forms as required for the paper bids. Note – electronic bids must be secured with a bid bond. In the event that an electronically submitted bid has a corrupted attachment the bid will be considered null and void.
ALL BIDDERS must be properly licensed contractors at the time of contract award in accordance with the provisions of the State of Alabama and must indicate their current Alabama General Contractors License number on the outside of the sealed envelope containing their Bid, and on their Bid.
It is the policy of the Northwest Alabama Regional Airport Authority that disadvantaged business enterprises as defined in 40 CFR Part 26 shall have the maximum opportunity to participate in the performance of contracts funded in whole or part with Federal funds.
All bidders and proposers shall make good faith efforts, as defined in Appendix A of 49 CFR Part 26, Regulations of the Office of the Secretary of Transportation, to subcontract 7.29% of the dollar value of the prime contract to small business concerns owned and controlled by socially and economically disadvantaged individuals (DBE). In the event the bidder for this solicitation qualifies as DBE, the contract goal shall be deemed to have been met. Individuals who are rebuttable presumed to be socially and economically disadvantaged include women, Blacks, Hispanics, Native Americans, Asian-Pacific Americans and Asian-Indian Americans. The apparent successful bidder (proposer) will be required to submit information concerning the DBE’s that will participate in this contract (subcontract). The information will include the name and address of each DBE, a description of the work to be performed by each named firm, and the dollar value of the contract (subcontract). If the bidder fails to achieve the contract goal as stated herein, it will be required to provide documentation demonstrating that it made good faith efforts in attempting to do so. A bid that fails to meet these requirements will be considered nonresponsive.
By submitting a bid under this solicitation, except for those items listed by the bidder on a separate and clearly identified attachment to this bid, the bidder certifies that steel and each manufactured product, is produced in the United States (as defined in the clause Buy American - Steel and Manufactured Products For Construction Contracts) and that components of unknown origin are considered to have been produced or manufactured outside the United States.
Bidders may obtain from Michael Baker International, Inc. lists of articles, materials, and supplies accepted from this provision.
The Northwest Alabama Regional Airport Authority reserves the right to waive any informalities or irregularities in the bids received and to reject any or all bids or to award or refrain from awarding the contract for the work, whichever is deemed to be in the Owner's best interests.
BY: Barry Griffith
TITLE: Airport Director
FOR: Northwest Alabama Regional Airport
PUBLICATION: TIMES DAILY
ADVERTISEMENT DATES: September 18, 24, and October 1, 2024